Production and delivery

Export Logistics for Lingerie and Shapewear Programs

Review shipping terms, export documents, packaging and the production window before your order is scheduled for dispatch.

  • FOB Shenzhen or Guangzhou
  • 25–45 day bulk window
  • Sea, air and courier options
Review logistics →

Production and delivery

Plan the shipment around the approved order

Bulk lead time is normally 25–45 days after deposit and Golden Sample approval. The exact schedule depends on material availability, dyeing, construction complexity, quantity, inspection and the shipping method confirmed in the PI.

Bulk production25–45

Days after deposit and Golden Sample approval.

Loading portsFOB

Shenzhen or Guangzhou; other Incoterms by agreement.

Sampling72h+

Stock samples in 72 hours; custom samples usually in 7–10 days.

Shipping modes3

Sea, air and courier options confirmed against the order.

Shipping and documentation

What is agreed before dispatch

Shipping terms

We routinely quote FOB Shenzhen or Guangzhou. CIF, CF, DAP and DDP terms may be available by destination and order size. EXW is considered only when agreed in advance.

Shipping methods

Sea freight for larger programs, air freight for time-sensitive replenishment, and courier service for samples or small parcels. The selected method and estimated transit time are stated in the quotation.

Export documentation

Commercial invoice, packing list and bill of lading or airway bill are prepared for the shipment. Certificates of origin or other documents are provided when required and agreed.

Cartons and labelling

Packaging can be developed for wholesale, retail or e-commerce use. Carton marks, barcode labels, polybag warnings and marketplace requirements should be confirmed before production.

StageWhat is confirmed
SamplingStock samples are typically available in 72 hours; custom samples usually take 7–10 days after specifications and materials are confirmed.
Before bulkGolden Sample, measurements, labels, packaging and inspection criteria are approved.
Bulk productionTypical production window is 25–45 days after deposit and sample approval.
Before dispatchFinal inspection, packing confirmation, shipping documents and balance-payment status are checked.
Delivery dates are order-specific

A production or transit date is not final until the style, quantity, materials, destination and shipping terms are confirmed in the PI. Delays caused by late approvals or incomplete shipping instructions are reviewed with the buyer.

Need a landed-cost or shipping review?

Send the destination postcode, order volume, requested delivery date and preferred Incoterm.

Discuss logistics